Air Freshener for Mercedes-Benz G-Class: Heavy Load Hauling
This air freshener is the version most often ordered for heavy load hauling on the Mercedes-Benz G-Class. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a supplier who changed material without saying so, or premature wear on the first batch. Both come from a specification that was never written down.

Specification
| Product | Air Freshener |
|---|---|
| Vehicle application | Mercedes-Benz G-Class |
| Intended use | Heavy Load Hauling |
| Base material | Ceramic Composite |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | RoHS |
Why this version
- Material — Ceramic Composite, chosen for the heavy load hauling duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Mercedes-Benz G-Class without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Car Organizer
- Car Antenna
- Tricycle Cargo Box
- Tricycle Parts Set
- Tricycle Axle
- Sun Shade
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; heavy load hauling is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.





