Tricycle Axle for Nissan X-Trail: Security Patrols
This tricycle axle is the version most often ordered for security patrols on the Nissan X-Trail. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: documentation that arrived after the container shipped, or lead time that slipped twice before bulk started. Both come from a specification that was never written down.

Specification
| Product | Tricycle Axle |
|---|---|
| Vehicle application | Nissan X-Trail |
| Intended use | Security Patrols |
| Base material | Cast Iron |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | SAE J431 |
Why this version
- Material — Cast Iron, chosen for the security patrols duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Nissan X-Trail without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Cable Tie Set
- Reflector Set
- Car Fan
- Valve Cap Set
- Dash Camera
- Snow Chain
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; security patrols is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SAE J431-compliant build instead of a fresh interpretation.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.






