Bus Parts Set for JAC T6: Heavy Load Hauling
This bus parts set is the version most often ordered for heavy load hauling on the JAC T6. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a specification nobody had written down, or premature wear on the first batch. Both come from a specification that was never written down.

Specification
| Product | Bus Parts Set |
|---|---|
| Vehicle application | JAC T6 |
| Intended use | Heavy Load Hauling |
| Base material | Bronze |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | SAE J431 |
Why this version
- Material — Bronze, chosen for the heavy load hauling duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the JAC T6 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Adhesive Tape Roll
- Jump Starter
- Sun Shade
- Car Fan
- Floor Mat
- Fuel Dispenser
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; heavy load hauling is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Ask for the current catalogue and the specification sheet for this line.







