Wheel Cover for Toyota Fortuner: Construction Sites
This wheel cover is the version most often ordered for construction sites on the Toyota Fortuner. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: warranty claims traced back to a single lot, or a fitment that looked right on paper and failed on the bench. Both come from a specification that was never written down.

Specification
| Product | Wheel Cover |
|---|---|
| Vehicle application | Toyota Fortuner |
| Intended use | Construction Sites |
| Base material | ABS Plastic |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | E-mark |
Why this version
- Material — ABS Plastic, chosen for the construction sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Toyota Fortuner without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Dash Camera
- Snow Chain
- Wheel Cover
- Fuel Dispenser
- Jump Starter
- Sun Shade
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; construction sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







