Work Lamp for Nissan X-Trail: Motocross
This work lamp is the version most often ordered for motocross on the Nissan X-Trail. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: packing that arrived crushed at the port, or inconsistent hardness between lots. Both come from a specification that was never written down.

Specification
| Product | Work Lamp |
|---|---|
| Vehicle application | Nissan X-Trail |
| Intended use | Motocross |
| Base material | Titanium Alloy |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | RoHS |
Why this version
- Material — Titanium Alloy, chosen for the motocross duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Nissan X-Trail without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Car Refrigerator
- Car Vacuum Cleaner
- Tyre Inflator
- Car Rice Cooker
- Tricycle Parts Set
- Tow Rope
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; motocross is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







