Car Organizer for Haval H6: Mountain Roads
This car organizer is the version most often ordered for mountain roads on the Haval H6. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: packing that arrived crushed at the port, or reorders that did not match the approved sample. Both come from a specification that was never written down.

Specification
| Product | Car Organizer |
|---|---|
| Vehicle application | Haval H6 |
| Intended use | Mountain Roads |
| Base material | Titanium Alloy |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | CCC |
Why this version
- Material — Titanium Alloy, chosen for the mountain roads duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Haval H6 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Wheel Chock
- Reflector Set
- Snow Chain
- Car Fan
- Adhesive Tape Roll
- Valve Cap Set
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mountain roads is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







