Sun Shade for Jeep Wrangler: Heavy Load Hauling
This sun shade is the version most often ordered for heavy load hauling on the Jeep Wrangler. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or warranty claims traced back to a single lot. Both come from a specification that was never written down.

Specification
| Product | Sun Shade |
|---|---|
| Vehicle application | Jeep Wrangler |
| Intended use | Heavy Load Hauling |
| Base material | Zinc Plated Steel |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | CCC |
Why this version
- Material — Zinc Plated Steel, chosen for the heavy load hauling duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Jeep Wrangler without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Gas Station Nozzle
- License Plate Frame
- Jump Starter
- Bus Parts Set
- Parking Barrier
- Steering Cover
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; heavy load hauling is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







