Parking Barrier for Volvo XC60: Coastal Delivery
This parking barrier is the version most often ordered for coastal delivery on the Volvo XC60. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or reorders that did not match the approved sample. Both come from a specification that was never written down.

Specification
| Product | Parking Barrier |
|---|---|
| Vehicle application | Volvo XC60 |
| Intended use | Coastal Delivery |
| Base material | Semi-Metallic Compound |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | REACH |
Why this version
- Material — Semi-Metallic Compound, chosen for the coastal delivery duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Volvo XC60 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Bike Rack
- Car Fan
- Reflector Set
- Work Lamp
- Specialized Vehicle Kit
- Sun Shade
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; coastal delivery is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the REACH-compliant build instead of a fresh interpretation.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







