Welcome to Auto, Motorcycle Parts & Accessories official website!
AC Compressor for JAC T6: Silicone

AC Compressor for JAC T6: Silicone

AC Compressor for JAC T6: SiliconeThis ac compressor for the JAC T6 is specified around silicone, which decides how it behaves in service far more than the part name does. We build to a written.

Contact Number:
Product Details

AC Compressor for JAC T6: Silicone

This ac compressor for the JAC T6 is specified around silicone, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is documentation that arrived after the container shipped, or a specification nobody had written down. Both are specification problems, and both are preventable.

JAC T6 AC Compressor

Specification

ProductAC Compressor
Vehicle applicationJAC T6
Material / finishSilicone
Typical useConstruction Sites
MOQ200 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time20-55 days after approval
ComplianceREACH
Packing20 pieces per inner box, 1000 per carton

Material options

  • Neoprene — selected when the part is exposed to weather and road salt
  • PU Leather — preferred when weight matters more than rigidity
  • Natural Rubber — the cost-effective default for volume programmes
  • Powder Coated Steel — preferred when weight matters more than rigidity
  • Chromed Steel — chosen where wear resistance comes first

AC Compressor detail

Processes available

  • gravity casting
  • powder coating
  • anodising
  • die casting
  • heat treatment
  • cold forging

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The specification above is the one most often ordered for construction sites. Related applications include rural transport, urban courier work, night riding, motocross, roadside assistance.

Quality and packing

  • In-line inspection with AQL 4.0 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top