Gearbox Solenoid for Honda CR-V: Semi-Metallic Compound
This gearbox solenoid for the Honda CR-V is specified around semi-metallic compound, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or a fitment that looked right on paper and failed on the bench. Both are specification problems, and both are preventable.

Specification
| Product | Gearbox Solenoid |
|---|---|
| Vehicle application | Honda CR-V |
| Material / finish | Semi-Metallic Compound |
| Typical use | Motocross |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-40 days after approval |
| Compliance | ISO/TS 16949 |
| Packing | 100 pieces per inner box, 200 per carton |
Material options
- Polypropylene — specified where the part sits close to a heat source
- Natural Rubber — chosen where wear resistance comes first
- Kevlar Composite — used when the finish has to hold a coating
- Zinc Plated Steel — specified where the part sits close to a heat source
- Nylon 66 — selected when the part is exposed to weather and road salt

Processes available
- robot welding
- injection moulding
- CNC machining
- electroplating
- laser cutting
- assembly line testing
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for motocross. Related applications include urban courier work, construction sites, weekend riding, airport ground fleets, night riding.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
Ask for the current catalogue and the specification sheet for this line.







