Welcome to Auto, Motorcycle Parts & Accessories official website!
Receiver Drier for Subaru Outback: EPDM Rubber

Receiver Drier for Subaru Outback: EPDM Rubber

Receiver Drier for Subaru Outback: EPDM RubberThis receiver drier for the Subaru Outback is specified around epdm rubber, which decides how it behaves in service far more than the part name does. We.

Contact Number:
Product Details

Receiver Drier for Subaru Outback: EPDM Rubber

This receiver drier for the Subaru Outback is specified around epdm rubber, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or a supplier who changed material without saying so. Both are specification problems, and both are preventable.

Subaru Outback Receiver Drier

Specification

ProductReceiver Drier
Vehicle applicationSubaru Outback
Material / finishEPDM Rubber
Typical useConstruction Sites
MOQ500 pieces per specification
Sampling14 working days, 3 days per revision
Bulk lead time15-30 days after approval
ComplianceDOT
Packing20 pieces per inner box, 1000 per carton

Material options

  • Tempered Glass — the cost-effective default for volume programmes
  • Polypropylene — used when the finish has to hold a coating
  • Titanium Alloy — the cost-effective default for volume programmes
  • Sintered Metal — selected when the part is exposed to weather and road salt
  • Stainless Steel — used when the finish has to hold a coating

Receiver Drier detail

Processes available

  • heat treatment
  • injection moulding
  • precision stamping
  • assembly line testing
  • CNC machining
  • sintering

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The specification above is the one most often ordered for construction sites. Related applications include wet weather riding, delivery fleets, rural transport, rental fleets, coastal delivery.

Quality and packing

  • In-line inspection with AQL 1.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the DOT-compliant build instead of a fresh interpretation.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top