Floor Mat for Hyundai i20: Heavy Load Hauling
This floor mat is the version most often ordered for heavy load hauling on the Hyundai i20. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or lead time that slipped twice before bulk started. Both come from a specification that was never written down.

Specification
| Product | Floor Mat |
|---|---|
| Vehicle application | Hyundai i20 |
| Intended use | Heavy Load Hauling |
| Base material | Carbon Fibre Composite |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | REACH |
Why this version
- Material — Carbon Fibre Composite, chosen for the heavy load hauling duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Hyundai i20 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Reflector Set
- Tow Rope
- Specialized Vehicle Kit
- Tricycle Cargo Box
- Car Antenna
- Air Freshener
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; heavy load hauling is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.






