Utility Trailer Kit for Citroen C5 Aircross: Adventure Travel
This utility trailer kit is the version most often ordered for adventure travel on the Citroen C5 Aircross. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a fitment that looked right on paper and failed on the bench, or a fitment that looked right on paper and failed on the bench. Both come from a specification that was never written down.

Specification
| Product | Utility Trailer Kit |
|---|---|
| Vehicle application | Citroen C5 Aircross |
| Intended use | Adventure Travel |
| Base material | EPDM Rubber |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | ISO/TS 16949 |
Why this version
- Material — EPDM Rubber, chosen for the adventure travel duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Citroen C5 Aircross without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Tire Gauge
- Jack Stand
- Car Organizer
- Floor Mat
- Adhesive Tape Roll
- Jump Starter
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; adventure travel is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







