Roof Box for Nissan Patrol: Motocross
This roof box is the version most often ordered for motocross on the Nissan Patrol. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or a supplier who changed material without saying so. Both come from a specification that was never written down.

Specification
| Product | Roof Box |
|---|---|
| Vehicle application | Nissan Patrol |
| Intended use | Motocross |
| Base material | Powder Coated Steel |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | IATF 16949 |
Why this version
- Material — Powder Coated Steel, chosen for the motocross duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Nissan Patrol without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Phone Holder
- Jump Starter
- Cargo Net
- Car Fan
- Loading Ramp
- Trim Clip Set
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; motocross is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







