Adhesive Tape Roll for Honda CR-V: Construction Sites
This adhesive tape roll is the version most often ordered for construction sites on the Honda CR-V. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a supplier who changed material without saying so, or warranty claims traced back to a single lot. Both come from a specification that was never written down.

Specification
| Product | Adhesive Tape Roll |
|---|---|
| Vehicle application | Honda CR-V |
| Intended use | Construction Sites |
| Base material | Ceramic Composite |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | TUV |
Why this version
- Material — Ceramic Composite, chosen for the construction sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Honda CR-V without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Reflector Set
- Secondhand Vehicle Stock
- Sun Shade
- License Plate Frame
- Floor Mat
- Utility Trailer Kit
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; construction sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Ask for the current catalogue and the specification sheet for this line.







