Cargo Net for Toyota Fortuner: Weekend Riding
This cargo net is the version most often ordered for weekend riding on the Toyota Fortuner. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a specification nobody had written down, or inconsistent hardness between lots. Both come from a specification that was never written down.

Specification
| Product | Cargo Net |
|---|---|
| Vehicle application | Toyota Fortuner |
| Intended use | Weekend Riding |
| Base material | ABS Plastic |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | ISO/TS 16949 |
Why this version
- Material — ABS Plastic, chosen for the weekend riding duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Toyota Fortuner without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Bike Rack
- Cargo Net
- Wheel Stop
- Valve Cap Set
- Fuel Dispenser
- Roof Box
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; weekend riding is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







