Headlight Bulb Kit for Jeep Wrangler: Delivery Fleets
This headlight bulb kit is the version most often ordered for delivery fleets on the Jeep Wrangler. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or a supplier who changed material without saying so. Both come from a specification that was never written down.

Specification
| Product | Headlight Bulb Kit |
|---|---|
| Vehicle application | Jeep Wrangler |
| Intended use | Delivery Fleets |
| Base material | Powder Coated Steel |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | RoHS |
Why this version
- Material — Powder Coated Steel, chosen for the delivery fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Jeep Wrangler without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Tire Gauge
- Tricycle Axle
- Wheel Cover
- Fuse Kit
- Fuel Dispenser
- License Plate Frame
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; delivery fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Ask for the current catalogue and the specification sheet for this line.







