Welcome to Auto, Motorcycle Parts & Accessories official website!
Adhesive Tape Roll for Haval H6: Heavy Load Hauling

Adhesive Tape Roll for Haval H6: Heavy Load Hauling

Adhesive Tape Roll for Haval H6: Heavy Load HaulingThis adhesive tape roll is the version most often ordered for heavy load hauling on the Haval H6. It is supplied to a written specification covering.

Contact Number:
Product Details

Adhesive Tape Roll for Haval H6: Heavy Load Hauling

This adhesive tape roll is the version most often ordered for heavy load hauling on the Haval H6. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.

What usually goes wrong is ordinary: documentation that arrived after the container shipped, or warranty claims traced back to a single lot. Both come from a specification that was never written down.

Adhesive Tape Roll for Haval H6

Specification

ProductAdhesive Tape Roll
Vehicle applicationHaval H6
Intended useHeavy Load Hauling
Base materialKevlar Composite
MOQ3,000 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceREACH

Why this version

  • Material — Kevlar Composite, chosen for the heavy load hauling duty cycle rather than for showroom appearance.
  • Capacity — sized for continuous use, not for intermittent demonstration use.
  • Mounting — fixed to the Haval H6 without modification to the vehicle.
  • Service — wearing parts are replaceable without replacing the whole unit.
  • Packing — carton sized for a warehouse shelf, marked to your barcode.

Adhesive Tape Roll in use

Related lines

  • Wheel Cover
  • Work Lamp
  • Phone Holder
  • Car Antenna
  • Headlight Bulb Kit
  • Dash Camera

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Ordering checklist

  1. Confirm the model year, market version and mounting points.
  2. State the duty cycle; heavy load hauling is not the same specification as occasional use.
  3. Approve a sample built from bulk material.
  4. Fix packing and marking before the first container.
  5. Inspect before balance payment.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top