Oil Pump for GasGas EC 250: Heavy Duty
This oil pump is built for the GasGas EC 250 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the heavy duty programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: packing that arrived crushed at the port, or a supplier who changed material without saying so. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Oil Pump |
|---|---|
| Fitment | GasGas EC 250 |
| Version | Heavy Duty |
| Base material | Zinc Plated Steel |
| Typical use | Food Delivery |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 25-45 days after approval |
| Compliance | SGS |
What decides whether it lasts
- Material — Zinc Plated Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual GasGas EC 250 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- robot welding
- die casting
- surface grinding
- shot blasting
- cold forging
- anodising
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The heavy duty build is the one most often ordered for food delivery. Riders also fit it for food delivery, adventure travel, roadside assistance, night riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.





