Welcome to Auto, Motorcycle Parts & Accessories official website!
Tank Bag for KTM EXC 300: Budget Line

Tank Bag for KTM EXC 300: Budget Line

Tank Bag for KTM EXC 300: Budget LineThis tank bag is built for the KTM EXC 300 and supplied to a written specification, so the part that comes off the line in the next order matches the one you.

Contact Number:
Product Details

Tank Bag for KTM EXC 300: Budget Line

This tank bag is built for the KTM EXC 300 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the budget line programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or a specification nobody had written down. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Tank Bag for KTM EXC 300

Specification

PartTank Bag
FitmentKTM EXC 300
VersionBudget Line
Base materialBrass
Typical useWet Weather Riding
MOQ2,000 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time20-60 days after approval
ComplianceIATF 16949

What decides whether it lasts

  • Material — Brass is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual KTM EXC 300 mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Tank Bag production

Processes used on this line

  • powder coating
  • robot welding
  • shot blasting
  • gravity casting
  • sintering
  • anodising

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The budget line build is the one most often ordered for wet weather riding. Riders also fit it for rental fleets, security patrols, farm use, food delivery.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top