Speedometer for Bajaj Pulsar 150: Sealed Unit
This speedometer is built for the Bajaj Pulsar 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the sealed unit programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: inconsistent hardness between lots, or packing that arrived crushed at the port. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Speedometer |
|---|---|
| Fitment | Bajaj Pulsar 150 |
| Version | Sealed Unit |
| Base material | Zinc Plated Steel |
| Typical use | Ride-Hailing Fleets |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | IATF 16949 |
What decides whether it lasts
- Material — Zinc Plated Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Bajaj Pulsar 150 mounting, not on a catalogue drawing.
- Finish — powder coating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- cold forging
- assembly line testing
- robot welding
- powder coating
- laser cutting
- CNC machining
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The sealed unit build is the one most often ordered for ride-hailing fleets. Riders also fit it for ride-hailing fleets, food delivery, motocross, heavy load hauling.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







