Welcome to Auto, Motorcycle Parts & Accessories official website!
Fuel Tap for Yamaha Ténéré 700: Sealed Unit

Fuel Tap for Yamaha Ténéré 700: Sealed Unit

Fuel Tap for Yamaha Ténéré 700: Sealed UnitThis fuel tap is built for the Yamaha Ténéré 700 and supplied to a written specification, so the part that comes off the line in the next order matches the.

Contact Number:
Product Details

Fuel Tap for Yamaha Ténéré 700: Sealed Unit

This fuel tap is built for the Yamaha Ténéré 700 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the sealed unit programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or a supplier who changed material without saying so. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Fuel Tap for Yamaha Ténéré 700

Specification

PartFuel Tap
FitmentYamaha Ténéré 700
VersionSealed Unit
Base materialChromed Steel
Typical useFarm Use
MOQ1,000 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time20-60 days after approval
ComplianceTUV

What decides whether it lasts

  • Material — Chromed Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Yamaha Ténéré 700 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Fuel Tap production

Processes used on this line

  • precision stamping
  • CNC machining
  • injection moulding
  • anodising
  • sintering
  • assembly line testing

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The sealed unit build is the one most often ordered for farm use. Riders also fit it for roadside assistance, ride-hailing fleets, off-road trails, security patrols.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

What testing is included?

Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top