Saddle Bag for Suzuki GS125: Sealed Unit
This saddle bag is built for the Suzuki GS125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the sealed unit programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: inconsistent hardness between lots, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Saddle Bag |
|---|---|
| Fitment | Suzuki GS125 |
| Version | Sealed Unit |
| Base material | PVC Coated Fabric |
| Typical use | Mining Sites |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 25-45 days after approval |
| Compliance | TUV |
What decides whether it lasts
- Material — PVC Coated Fabric is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Suzuki GS125 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- heat treatment
- rubber vulcanisation
- sintering
- injection moulding
- laser cutting
- powder coating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The sealed unit build is the one most often ordered for mining sites. Riders also fit it for urban courier work, heavy load hauling, farm use, roadside assistance.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







