Welcome to Auto, Motorcycle Parts & Accessories official website!
Fuel Line for Zongshen 150: OEM Replacement

Fuel Line for Zongshen 150: OEM Replacement

Fuel Line for Zongshen 150: OEM ReplacementThis fuel line is built for the Zongshen 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one.

Contact Number:
Product Details

Fuel Line for Zongshen 150: OEM Replacement

This fuel line is built for the Zongshen 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the oem replacement programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: reorders that did not match the approved sample, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Fuel Line for Zongshen 150

Specification

PartFuel Line
FitmentZongshen 150
VersionOEM Replacement
Base materialCarbon Steel
Typical useFarm Use
MOQ1,000 pieces per specification
Sampling14 working days, 3 days per revision
Bulk lead time20-45 days after approval
ComplianceISO 9001

What decides whether it lasts

  • Material — Carbon Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Zongshen 150 mounting, not on a catalogue drawing.
  • Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Fuel Line production

Processes used on this line

  • rubber vulcanisation
  • heat treatment
  • robot welding
  • cold forging
  • powder coating
  • CNC machining

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The oem replacement build is the one most often ordered for farm use. Riders also fit it for off-road trails, wet weather riding, coastal delivery, construction sites.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top