Luggage Rack for Loncin 150: Budget Line
This luggage rack is built for the Loncin 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the budget line programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or documentation that arrived after the container shipped. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Luggage Rack |
|---|---|
| Fitment | Loncin 150 |
| Version | Budget Line |
| Base material | Tempered Glass |
| Typical use | Mining Sites |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | RoHS |
What decides whether it lasts
- Material — Tempered Glass is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Loncin 150 mounting, not on a catalogue drawing.
- Finish — powder coating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- shot blasting
- assembly line testing
- sintering
- injection moulding
- die casting
- robot welding
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The budget line build is the one most often ordered for mining sites. Riders also fit it for weekend riding, security patrols, food delivery, adventure travel.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







