Carburetor Repair Kit for Zongshen 150: Vented Design
This carburetor repair kit is built for the Zongshen 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the vented design programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Carburetor Repair Kit |
|---|---|
| Fitment | Zongshen 150 |
| Version | Vented Design |
| Base material | Polypropylene |
| Typical use | Rural Transport |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | CCC |
What decides whether it lasts
- Material — Polypropylene is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Zongshen 150 mounting, not on a catalogue drawing.
- Finish — powder coating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- injection moulding
- gravity casting
- rubber vulcanisation
- CNC machining
- shot blasting
- sintering
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The vented design build is the one most often ordered for rural transport. Riders also fit it for ride-hailing fleets, coastal delivery, passenger transport, construction sites.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.
Ask for the current catalogue and the specification sheet for this line.







