Steering Stem for Shineray XY125: Long Life Version
This steering stem is built for the Shineray XY125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the long life version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a specification nobody had written down, or packing that arrived crushed at the port. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Steering Stem |
|---|---|
| Fitment | Shineray XY125 |
| Version | Long Life Version |
| Base material | Stainless Steel |
| Typical use | Track Days |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 20-60 days after approval |
| Compliance | ECE R90 |
What decides whether it lasts
- Material — Stainless Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Shineray XY125 mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- gravity casting
- ultrasonic cleaning
- robot welding
- electroplating
- heat treatment
- CNC machining
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The long life version build is the one most often ordered for track days. Riders also fit it for food delivery, daily commuting, passenger transport, ride-hailing fleets.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







