Crankshaft Assembly for TVS Apache RTR 160: Adjustable Type
This crankshaft assembly is built for the TVS Apache RTR 160 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the adjustable type programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: inconsistent hardness between lots, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Crankshaft Assembly |
|---|---|
| Fitment | TVS Apache RTR 160 |
| Version | Adjustable Type |
| Base material | Magnesium Alloy |
| Typical use | Weekend Riding |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | ECE R90 |
What decides whether it lasts
- Material — Magnesium Alloy is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual TVS Apache RTR 160 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- anodising
- powder coating
- gravity casting
- CNC machining
- electroplating
- heat treatment
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The adjustable type build is the one most often ordered for weekend riding. Riders also fit it for night riding, passenger transport, rural transport, coastal delivery.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Ask for the current catalogue and the specification sheet for this line.







