Stator Assembly for Yamaha FZ16: Fixed Type
This stator assembly is built for the Yamaha FZ16 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the fixed type programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Stator Assembly |
|---|---|
| Fitment | Yamaha FZ16 |
| Version | Fixed Type |
| Base material | Chromed Steel |
| Typical use | Airport Ground Fleets |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 25-35 days after approval |
| Compliance | IATF 16949 |
What decides whether it lasts
- Material — Chromed Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Yamaha FZ16 mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- assembly line testing
- robot welding
- precision stamping
- shot blasting
- surface grinding
- gravity casting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The fixed type build is the one most often ordered for airport ground fleets. Riders also fit it for daily commuting, off-road trails, weekend riding, food delivery.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







