Choke Cable for Honda ADV160: Upgraded Version
This choke cable is built for the Honda ADV160 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the upgraded version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Choke Cable |
|---|---|
| Fitment | Honda ADV160 |
| Version | Upgraded Version |
| Base material | Reinforced Nylon |
| Typical use | Night Riding |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | ECE R90 |
What decides whether it lasts
- Material — Reinforced Nylon is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Honda ADV160 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- heat treatment
- shot blasting
- gravity casting
- die casting
- surface grinding
- ultrasonic cleaning
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The upgraded version build is the one most often ordered for night riding. Riders also fit it for airport ground fleets, off-road trails, mining sites, mountain roads.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







