Welcome to Auto, Motorcycle Parts & Accessories official website!
Kick Starter for Dayun 150: Sealed Unit

Kick Starter for Dayun 150: Sealed Unit

Kick Starter for Dayun 150: Sealed UnitThis kick starter is built for the Dayun 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you.

Contact Number:
Product Details

Kick Starter for Dayun 150: Sealed Unit

This kick starter is built for the Dayun 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the sealed unit programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: packing that arrived crushed at the port, or a supplier who changed material without saying so. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Kick Starter for Dayun 150

Specification

PartKick Starter
FitmentDayun 150
VersionSealed Unit
Base materialNeoprene
Typical useUrban Courier Work
MOQ1,000 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time20-45 days after approval
ComplianceRoHS

What decides whether it lasts

  • Material — Neoprene is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Dayun 150 mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Kick Starter production

Processes used on this line

  • ultrasonic cleaning
  • injection moulding
  • powder coating
  • sintering
  • gravity casting
  • cold forging

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The sealed unit build is the one most often ordered for urban courier work. Riders also fit it for urban courier work, roadside assistance, night riding, long-distance touring.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top