Cooling Fan for Hero Passion Pro: Vented Design
This cooling fan is built for the Hero Passion Pro and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the vented design programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: reorders that did not match the approved sample, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Cooling Fan |
|---|---|
| Fitment | Hero Passion Pro |
| Version | Vented Design |
| Base material | Cast Iron |
| Typical use | Rural Transport |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 20-35 days after approval |
| Compliance | IATF 16949 |
What decides whether it lasts
- Material — Cast Iron is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Hero Passion Pro mounting, not on a catalogue drawing.
- Finish — powder coating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- ultrasonic cleaning
- heat treatment
- rubber vulcanisation
- cold forging
- laser cutting
- surface grinding
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The vented design build is the one most often ordered for rural transport. Riders also fit it for motocross, off-road trails, long-distance touring, airport ground fleets.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







