Rear Sprocket for Bajaj CT100: Drilled and Slotted
This rear sprocket is built for the Bajaj CT100 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the drilled and slotted programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or packing that arrived crushed at the port. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Rear Sprocket |
|---|---|
| Fitment | Bajaj CT100 |
| Version | Drilled and Slotted |
| Base material | PVC Coated Fabric |
| Typical use | Food Delivery |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | SAE J431 |
What decides whether it lasts
- Material — PVC Coated Fabric is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Bajaj CT100 mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- ultrasonic cleaning
- anodising
- die casting
- surface grinding
- gravity casting
- assembly line testing
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The drilled and slotted build is the one most often ordered for food delivery. Riders also fit it for delivery fleets, daily commuting, farm use, mountain roads.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







