Seat Cover for Yamaha YBR125: Vented Design
This seat cover is built for the Yamaha YBR125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the vented design programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or documentation that arrived after the container shipped. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Seat Cover |
|---|---|
| Fitment | Yamaha YBR125 |
| Version | Vented Design |
| Base material | Powder Coated Steel |
| Typical use | Urban Courier Work |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 20-45 days after approval |
| Compliance | REACH |
What decides whether it lasts
- Material — Powder Coated Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Yamaha YBR125 mounting, not on a catalogue drawing.
- Finish — powder coating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- die casting
- injection moulding
- rubber vulcanisation
- precision stamping
- shot blasting
- heat treatment
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The vented design build is the one most often ordered for urban courier work. Riders also fit it for wet weather riding, passenger transport, night riding, delivery fleets.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What testing is included?
Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







