Wheel Rim for TVS Jupiter: Budget Line
This wheel rim is built for the TVS Jupiter and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the budget line programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Wheel Rim |
|---|---|
| Fitment | TVS Jupiter |
| Version | Budget Line |
| Base material | Ceramic Composite |
| Typical use | Daily Commuting |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 25-45 days after approval |
| Compliance | ECE R90 |
What decides whether it lasts
- Material — Ceramic Composite is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual TVS Jupiter mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- sintering
- injection moulding
- anodising
- heat treatment
- ultrasonic cleaning
- laser cutting
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The budget line build is the one most often ordered for daily commuting. Riders also fit it for daily commuting, airport ground fleets, heavy load hauling, weekend riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
Ask for the current catalogue and the specification sheet for this line.







