Wheel Rim for Vespa Sprint: Vented Design
This wheel rim is built for the Vespa Sprint and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the vented design programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Wheel Rim |
|---|---|
| Fitment | Vespa Sprint |
| Version | Vented Design |
| Base material | Kevlar Composite |
| Typical use | Delivery Fleets |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 30-45 days after approval |
| Compliance | SAE J431 |
What decides whether it lasts
- Material — Kevlar Composite is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Vespa Sprint mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- surface grinding
- rubber vulcanisation
- heat treatment
- precision stamping
- electroplating
- shot blasting
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The vented design build is the one most often ordered for delivery fleets. Riders also fit it for mining sites, construction sites, track days, motocross.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







