Welcome to Auto, Motorcycle Parts & Accessories official website!
Throttle Cable for Honda PCX160: Off-Road Version

Throttle Cable for Honda PCX160: Off-Road Version

Throttle Cable for Honda PCX160: Off-Road VersionThis throttle cable is built for the Honda PCX160 and supplied to a written specification, so the part that comes off the line in the next order.

Contact Number:
Product Details

Throttle Cable for Honda PCX160: Off-Road Version

This throttle cable is built for the Honda PCX160 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the off-road version programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: inconsistent hardness between lots, or lead time that slipped twice before bulk started. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Throttle Cable for Honda PCX160

Specification

PartThrottle Cable
FitmentHonda PCX160
VersionOff-Road Version
Base materialZinc Plated Steel
Typical useRoadside Assistance
MOQ500 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time30-60 days after approval
ComplianceSGS

What decides whether it lasts

  • Material — Zinc Plated Steel is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Honda PCX160 mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Throttle Cable production

Processes used on this line

  • gravity casting
  • anodising
  • die casting
  • cold forging
  • assembly line testing
  • powder coating

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The off-road version build is the one most often ordered for roadside assistance. Riders also fit it for rental fleets, track days, rural transport, mountain roads.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top