Gasket Kit for Kawasaki ZX-6R: Vented Design
This gasket kit is built for the Kawasaki ZX-6R and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the vented design programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Gasket Kit |
|---|---|
| Fitment | Kawasaki ZX-6R |
| Version | Vented Design |
| Base material | ABS Plastic |
| Typical use | Night Riding |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 30-45 days after approval |
| Compliance | E-mark |
What decides whether it lasts
- Material — ABS Plastic is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Kawasaki ZX-6R mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- assembly line testing
- robot welding
- heat treatment
- ultrasonic cleaning
- rubber vulcanisation
- cold forging
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The vented design build is the one most often ordered for night riding. Riders also fit it for motocross, off-road trails, airport ground fleets, food delivery.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







