Welcome to Auto, Motorcycle Parts & Accessories official website!
Air Box for Yamaha R6: Budget Line

Air Box for Yamaha R6: Budget Line

Air Box for Yamaha R6: Budget LineThis air box is built for the Yamaha R6 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved..

Contact Number:
Product Details

Air Box for Yamaha R6: Budget Line

This air box is built for the Yamaha R6 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the budget line programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: inconsistent hardness between lots, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Air Box for Yamaha R6

Specification

PartAir Box
FitmentYamaha R6
VersionBudget Line
Base materialCeramic Composite
Typical useOff-Road Trails
MOQ1,000 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time25-60 days after approval
ComplianceECE R90

What decides whether it lasts

  • Material — Ceramic Composite is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Yamaha R6 mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Air Box production

Processes used on this line

  • laser cutting
  • robot welding
  • injection moulding
  • assembly line testing
  • shot blasting
  • cold forging

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The budget line build is the one most often ordered for off-road trails. Riders also fit it for food delivery, coastal delivery, track days, heavy load hauling.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top