Chain Kit for Hero Splendor: Drilled and Slotted
This chain kit is built for the Hero Splendor and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the drilled and slotted programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: premature wear on the first batch, or reorders that did not match the approved sample. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Chain Kit |
|---|---|
| Fitment | Hero Splendor |
| Version | Drilled and Slotted |
| Base material | Powder Coated Steel |
| Typical use | Rental Fleets |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 30-60 days after approval |
| Compliance | IATF 16949 |
What decides whether it lasts
- Material — Powder Coated Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Hero Splendor mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- CNC machining
- anodising
- robot welding
- rubber vulcanisation
- powder coating
- laser cutting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The drilled and slotted build is the one most often ordered for rental fleets. Riders also fit it for construction sites, security patrols, roadside assistance, night riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Ask for the current catalogue and the specification sheet for this line.







