Exhaust Gasket for BMW R1250GS: Folding Type
This exhaust gasket is built for the BMW R1250GS and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the folding type programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or packing that arrived crushed at the port. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Exhaust Gasket |
|---|---|
| Fitment | BMW R1250GS |
| Version | Folding Type |
| Base material | Sintered Metal |
| Typical use | Adventure Travel |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 25-45 days after approval |
| Compliance | SAE J431 |
What decides whether it lasts
- Material — Sintered Metal is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual BMW R1250GS mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- sintering
- CNC machining
- shot blasting
- heat treatment
- surface grinding
- injection moulding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The folding type build is the one most often ordered for adventure travel. Riders also fit it for motocross, ride-hailing fleets, urban courier work, wet weather riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SAE J431-compliant build instead of a fresh interpretation.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







