Welcome to Auto, Motorcycle Parts & Accessories official website!
Choke Cable for Haojue 125: Two-Piece Construction

Choke Cable for Haojue 125: Two-Piece Construction

Choke Cable for Haojue 125: Two-Piece ConstructionThis choke cable is built for the Haojue 125 and supplied to a written specification, so the part that comes off the line in the next order matches.

Contact Number:
Product Details

Choke Cable for Haojue 125: Two-Piece Construction

This choke cable is built for the Haojue 125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a specification nobody had written down, or a specification nobody had written down. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Choke Cable for Haojue 125

Specification

PartChoke Cable
FitmentHaojue 125
VersionTwo-Piece Construction
Base materialNeoprene
Typical useWet Weather Riding
MOQ200 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time20-45 days after approval
ComplianceSAE J431

What decides whether it lasts

  • Material — Neoprene is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Haojue 125 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Choke Cable production

Processes used on this line

  • heat treatment
  • assembly line testing
  • die casting
  • injection moulding
  • anodising
  • precision stamping

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The two-piece construction build is the one most often ordered for wet weather riding. Riders also fit it for security patrols, construction sites, wet weather riding, roadside assistance.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top