Exhaust Pipe for Hero Splendor: Off-Road Version
This exhaust pipe is built for the Hero Splendor and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the off-road version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Exhaust Pipe |
|---|---|
| Fitment | Hero Splendor |
| Version | Off-Road Version |
| Base material | Tempered Glass |
| Typical use | Rental Fleets |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 25-45 days after approval |
| Compliance | IATF 16949 |
What decides whether it lasts
- Material — Tempered Glass is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Hero Splendor mounting, not on a catalogue drawing.
- Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- cold forging
- electroplating
- robot welding
- surface grinding
- assembly line testing
- shot blasting
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The off-road version build is the one most often ordered for rental fleets. Riders also fit it for weekend riding, coastal delivery, airport ground fleets, rural transport.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







