Speedometer for Suzuki GSX-R600: Upgraded Version
This speedometer is built for the Suzuki GSX-R600 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the upgraded version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: packing that arrived crushed at the port, or warranty claims traced back to a single lot. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Speedometer |
|---|---|
| Fitment | Suzuki GSX-R600 |
| Version | Upgraded Version |
| Base material | Magnesium Alloy |
| Typical use | Rental Fleets |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 30-60 days after approval |
| Compliance | ISO 9001 |
What decides whether it lasts
- Material — Magnesium Alloy is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Suzuki GSX-R600 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- shot blasting
- electroplating
- assembly line testing
- robot welding
- surface grinding
- gravity casting
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The upgraded version build is the one most often ordered for rental fleets. Riders also fit it for coastal delivery, daily commuting, motocross, passenger transport.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







