Welcome to Auto, Motorcycle Parts & Accessories official website!
Speedometer Cable for SYM Jet 14: Standard Replacement

Speedometer Cable for SYM Jet 14: Standard Replacement

Speedometer Cable for SYM Jet 14: Standard ReplacementThis speedometer cable is built for the SYM Jet 14 and supplied to a written specification, so the part that comes off the line in the next order.

Contact Number:
Product Details

Speedometer Cable for SYM Jet 14: Standard Replacement

This speedometer cable is built for the SYM Jet 14 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the standard replacement programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: documentation that arrived after the container shipped, or a specification nobody had written down. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Speedometer Cable for SYM Jet 14

Specification

PartSpeedometer Cable
FitmentSYM Jet 14
VersionStandard Replacement
Base materialSilicone
Typical useMountain Roads
MOQ3,000 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time25-35 days after approval
ComplianceIATF 16949

What decides whether it lasts

  • Material — Silicone is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual SYM Jet 14 mounting, not on a catalogue drawing.
  • Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Speedometer Cable production

Processes used on this line

  • cold forging
  • heat treatment
  • ultrasonic cleaning
  • die casting
  • surface grinding
  • robot welding

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The standard replacement build is the one most often ordered for mountain roads. Riders also fit it for track days, airport ground fleets, urban courier work, off-road trails.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top