Tail Light for Harley-Davidson Street 750: Quick Fit Version
This tail light is built for the Harley-Davidson Street 750 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the quick fit version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or documentation that arrived after the container shipped. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Tail Light |
|---|---|
| Fitment | Harley-Davidson Street 750 |
| Version | Quick Fit Version |
| Base material | Reinforced Nylon |
| Typical use | Roadside Assistance |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 25-35 days after approval |
| Compliance | SGS |
What decides whether it lasts
- Material — Reinforced Nylon is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Harley-Davidson Street 750 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- heat treatment
- CNC machining
- sintering
- shot blasting
- precision stamping
- injection moulding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The quick fit version build is the one most often ordered for roadside assistance. Riders also fit it for delivery fleets, wet weather riding, passenger transport, ride-hailing fleets.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







