Steering Stem for Kymco Like 125: Lightweight Version
This steering stem is built for the Kymco Like 125 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the lightweight version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: inconsistent hardness between lots, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Steering Stem |
|---|---|
| Fitment | Kymco Like 125 |
| Version | Lightweight Version |
| Base material | Cast Iron |
| Typical use | Farm Use |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 30-35 days after approval |
| Compliance | DOT |
What decides whether it lasts
- Material — Cast Iron is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Kymco Like 125 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- laser cutting
- robot welding
- ultrasonic cleaning
- shot blasting
- injection moulding
- precision stamping
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The lightweight version build is the one most often ordered for farm use. Riders also fit it for roadside assistance, passenger transport, airport ground fleets, wet weather riding.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What testing is included?
Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







