Ignition Coil for Husqvarna FE 350: Budget Line
This ignition coil is built for the Husqvarna FE 350 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the budget line programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a specification nobody had written down, or packing that arrived crushed at the port. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Ignition Coil |
|---|---|
| Fitment | Husqvarna FE 350 |
| Version | Budget Line |
| Base material | Anodised Aluminium |
| Typical use | Off-Road Trails |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | ISO 9001 |
What decides whether it lasts
- Material — Anodised Aluminium is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Husqvarna FE 350 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- CNC machining
- cold forging
- injection moulding
- heat treatment
- gravity casting
- precision stamping
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The budget line build is the one most often ordered for off-road trails. Riders also fit it for rural transport, delivery fleets, track days, coastal delivery.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







