Silencer for Kawasaki KLX150: Load Rated Version
This silencer is built for the Kawasaki KLX150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the load rated version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or reorders that did not match the approved sample. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Silencer |
|---|---|
| Fitment | Kawasaki KLX150 |
| Version | Load Rated Version |
| Base material | Stainless Steel |
| Typical use | Airport Ground Fleets |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 25-35 days after approval |
| Compliance | ECE R90 |
What decides whether it lasts
- Material — Stainless Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Kawasaki KLX150 mounting, not on a catalogue drawing.
- Finish — anodising holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- cold forging
- anodising
- surface grinding
- injection moulding
- ultrasonic cleaning
- powder coating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The load rated version build is the one most often ordered for airport ground fleets. Riders also fit it for ride-hailing fleets, roadside assistance, off-road trails, mining sites.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







