Chain Tensioner for TVS Apache RTR 160: Racing Spec
This chain tensioner is built for the TVS Apache RTR 160 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the racing spec programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a supplier who changed material without saying so, or premature wear on the first batch. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Chain Tensioner |
|---|---|
| Fitment | TVS Apache RTR 160 |
| Version | Racing Spec |
| Base material | Brass |
| Typical use | Track Days |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 30-60 days after approval |
| Compliance | TUV |
What decides whether it lasts
- Material — Brass is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual TVS Apache RTR 160 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- die casting
- injection moulding
- anodising
- electroplating
- sintering
- powder coating
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The racing spec build is the one most often ordered for track days. Riders also fit it for airport ground fleets, night riding, motocross, farm use.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







